EN
Install the app
Os 7304 · ZSSK · 7 November

Zvolen osob.st. → Banská Bystrica

On timeArrived in Banská Bystrica
Departure06:35Zvolen osob.st.
Estimated arrival07:14Banská Bystrica

Route · 7 stops · 39 min · 20 km

  1. 06:35Zvolen osob.st.departure–
  2. 06:37Zvolen mesto–
  3. 06:42Sliač kúpele5 min stop–
  4. 06:49Veľká Lúka–
  5. 06:53Hronsek–
  6. 06:57Vlkanová5 min stop–
  7. 07:07Radvaň–
  8. 07:11Banská Bystrica mesto–
  9. 07:14Banská Bystricaterminus–
Timetable and live data · ZSSK, updated at 15:48

Same number elsewhere: S3 7304 Vaihingen → Backnang (Germany) · Sz 7304 Szeged → Subotica (Hungary) · TGV INOUI 7304 Dunkerque → Paris Gare du Nord (France) · R 7304 Biel/Bienne → Sonceboz-Sombeval (Switzerland) · Os 7304 Cheb → Mariánské Lázně (Czechia)

Questions about Os 7304

Is Os 7304 late today?

It has no live data yet: its times are the scheduled ones.

What time does Os 7304 arrive in Banská Bystrica?

It is scheduled at 07:14.

What services are there on board Os 7304?

Planned in the ZSSK timetable: 1st class, Wi-Fi, Accessible toilet, Wheelchair spaces, Family area. Part of the way it runs coupled to another train: check your coach number.

How long is the journey from Zvolen osob.st. to Banská Bystrica?

39 min today. 20 km by rail, an average of 31 km/h including stops.

Which stations does Os 7304 call at?

Between Zvolen osob.st. and Banská Bystrica, it calls at 7 stations: Zvolen mesto, Sliač kúpele, Veľká Lúka, Hronsek, Vlkanová, Radvaň, Banská Bystrica mesto.

Which company runs Os 7304?

Os 7304 is run by ZSSK (Os). Its timetable and live data come from data published by ZSSK.

How do I let someone know when I arrive?

Open the train on the map, then « Share arrival »: they get a link, see the train coming in and know when to leave, with no account and nothing to install.

Follow on the map