Makov → Čadca
Route · 9 stops · 47 min · 24 km
- 10:07Makovdeparture–
- 10:10Nižný Kelčov–
- 10:15Vysoká n.Kysucou–
- 10:22Turzovka zast.–
- 10:27Turzovka2 min stop–
- 10:35Podvysoká–
- 10:38Staškov–
- 10:42Staškov zast.–
- 10:46Raková–
- 10:52Čadca zast.–
- 10:54Čadcaterminus–
Same number elsewhere: RE1 4013 Nurnberg → Munich (Germany) · S19 4013 Nivelles → Bruxelles-Luxembourg (Belgium) · RE 4013 Broc-Chocolaterie → Schmitten FR (Switzerland) · S 4013 Mürzzuschlag → Leibnitz Bahnhof (Austria) · Os 4013 Rájec-Jestřebí → Brno hlavní nádraží (Czechia)
Questions about Os 4013
Is Os 4013 late today?
It has no live data yet: its times are the scheduled ones.
What time does Os 4013 arrive in Čadca?
It is scheduled at 10:54.
How long is the journey from Makov to Čadca?
47 min today. 24 km by rail, an average of 31 km/h including stops.
Which stations does Os 4013 call at?
Between Makov and Čadca, it calls at 9 stations: Nižný Kelčov, Vysoká n.Kysucou, Turzovka zast., Turzovka, Podvysoká, Staškov, Staškov zast., Raková, Čadca zast..
Which company runs Os 4013?
Os 4013 is run by ZSSK (Os). Its timetable and live data come from data published by ZSSK.
How do I let someone know when I arrive?
Open the train on the map, then « Share arrival »: they get a link, see the train coming in and know when to leave, with no account and nothing to install.